South Wellington Substation

Image

Client: BC Hydro

Location: North of Nanaimo River Road in south Nanaimo

Completion Date: The new substation should be in operation by October 2014

Total Cost: $26 million, preliminary estimate

Purpose: To meet the growing demand for electricity in Nanaimo

Our Role: To perform the materials testing (including sub-grade inspection, soil density, and concrete) for quality control during construction.

Pedestals

Pedestals

Concrete pour

Concrete Pour

Peninsula Motor Inn

Image

Client: Belfor Property Restoration

Location: Peninsula Road, Ucluelet, BC

End Purpose: To renovate the Inn after fire damage

Duration of Our Work: 3 weeks

Our Role: To perform a HAZMAT Survey, complete a risk assessment, produce a safework procedure, monitoring of indoor air quality and control of hazardous material during asbestos abatement

Air Monitoring at Peninsula Motor Inn

HAZMAT Survey at Peninsula Motor Inn

Negative Air at Peninsula Motor Inn

Negative Air at Peninsula Motor Inn

Canadian Tire Centre

Image

Client: Shape Properties Corp.

Location: Nanaimo North Town Centre

Completion Date: November 1, 2013 (Opening Day)

Total Cost:

Purpose of Building: To meet the needs of a growing city; to help in the renewal of the mall

Our Role:

Subsurface Investigation (Feb 2012)

Subsurface Investigation (Feb 2012)

Retaining wall construction monitoring (Aug 2012)

Retaining wall construction monitoring (Aug 2012)

Erosion & Sediment Control monitoring (Oct 2012)

Erosion & Sediment Control monitoring (Oct 2012)

Density testing during Site Servicing (Feb 2013)

Density testing during Site Servicing (Feb 2013)